FORD WSS-M5D22-A PDF

FORD WSS-M5D22-A PDF

Name:
FORD WSS-M5D22-A PDF

Published Date:
06/25/2001

Status:
[ Revised ]

Description:

POLYOL FOR PUR FOAM, MOLDED

Publisher:
Ford Motor Company

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
ford-wss-m5d22-a_2857759

Choose Document Language:
9.00 €
Need Help?

1. SCOPE

The material defined by this specification is a polyether polyol (component A) with the necessary additives e. g. catalysts and stabilizers.


Edition : 01
File Size : 1 file , 23 KB
Number of Pages : 3
Published : 06/25/2001

History

FORD WSS-M5D22-A
Published Date: 08/11/2006
POLYOL FOR PUR FOAM, MOLDED ***TO USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M5D22-A
Published Date: 06/25/2001
POLYOL FOR PUR FOAM, MOLDED
9.00 €

Related products

FORD ESA-M1C75-B
Published Date: 10/14/2022
GREASE, GENERAL CHASSIS - LONG LIFE LUBRICATION ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M99P6-C1
Published Date: 01/12/2022
CERAMIC COATING PERFORMANCE REQUIREMENTS, FLOAT LAMINATED GLASS FOR WINDSHIELD
9.00 €
FORD WSK-M4D642-A2
Published Date: 02/18/2021
POLYAMIDE (PA) 66, HEAT STABILIZED, 30% GLASS FIBER REINFORCED MOLDING COMPOUND, INTERIOR ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €
FORD WSS-M11A47-A1
Published Date: 07/25/2012
SOLDER PASTE, 62 Sn/36 Pb/2 Ag, LOW VISCOSITY ***TO BE USED WITH FORD WSS-M99P1111-A***
9.00 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €