ISO/IEC TR 24769:2008 PDF

ISO/IEC TR 24769:2008 PDF

Name:
ISO/IEC TR 24769:2008 PDF

Published Date:
12/15/2008

Status:
Active

Description:

Information technology - Real-time locating system (RTLS) device conformance test methods - Test methods for air interface communication at 2,4 GHz

Publisher:
International Org. for Standardization/International Electrotechnical Commission (Technical Report)

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$48.6
Need Help?

ISO/IEC TR 24769:2008 defines the test methods for determining the conformance of 2,4 GHz real time locating system (RTLS) tags with the specifications given in the corresponding parts of ISO/IEC 24730-2, but does not apply to the testing of conformity with regulatory or similar requirements.

The test methods require only that the mandatory functions, and any optional functions which are implemented, be verified. This may in appropriate circumstances be supplemented by further, application specific, functionality criteria that are not available to the general case.

The RTLS tag conformance parameters included in this document include the mandatory direct sequence spread spectrum (DSSS) 2,4 GHz radio frequency beacon. It also includes the optional on-off keyed, frequency shift keyed (OOK/FSK) short range radio frequency link and the optional magnetic air interface.

Unless otherwise specified, the tests in ISO/IEC TR 24769:2008 apply exclusively to RTLS tags defined in ISO/IEC 24730-2.


File Size : 1 file , 470 KB
Published : 12/15/2008

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138