NR NR/L2/CIV/032/MOD04 ISSUE 1 PDF

NR NR/L2/CIV/032/MOD04 ISSUE 1 PDF

Name:
NR NR/L2/CIV/032/MOD04 ISSUE 1 PDF

Published Date:
12/04/2021

Status:
[ Active ]

Description:

The Management of Structures Manual: Structures Asset Evaluation

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
nr-nr-l2-civ-032-mod04-issue-1_2767152

Choose Document Language:
7.50 €
Need Help?
PDF ONLY

To undertake an evaluation the evaluator is required to:

• review the functionality of the structure;

• review the register of potential threats to the structure;

• review performance of the structure based on collected information;

• review the controls that manage the safety and performance of the structure;

• review the planned interventions and assess whether these achieve the intended aims;

• apply learning from incidents, errors and relevant experience;

• act in updating the planned controls and interventions for the structure based on findings;

• escalate issues that require peer review.

The principles of Asset Evaluation can be applied to all assets within the accountability of the Structures community, as identified in NR/L1/CIV/001.

The process is mandated for specific asset types as defined in clause 5. 

Purpose 

This module sets out the procedure and requirements for undertaking a structures Asset Evaluation. 

The purpose of an Asset Evaluation is to confirm the management actions for the structure sustain acceptable levels of safety and performance. 

The actions arising from an Asset Evaluation may include: 

• Establishing or updating the regime of management controls; 

• Collecting further information (e.g. monitoring, testing or investigation); 

• Carrying out works interventions; 

• Changing the permitted use of the structure; 

• Corresponding with other parties; 

• Reporting safety related events; 

• Arranging for the structure to be transferred or demolished; 

• Recording the decision that no actions are required. 


Edition : 1
File Size : 1 file , 260 KB
Number of Pages : 10
Published : 12/04/2021

History


Related products

NR TWI 3G028 ISSUE 1
Published Date: 03/01/2005
How to Manage Hot Weather Patrolling
5.70 €
NR NR/L3/MTC/ME0201/CAL248 ISSUE 1
Published Date: 06/07/2008
Calibration Of Temperature Test Sets
5.70 €
NR TWI 2C032 ISSUE 1
Published Date: 03/01/2005
How to Maintain Direct Fastenings
5.70 €
NR NR/L2/SIG/11774/SR0001SB ISSUE 2
Published Date: 06/03/2023
Network Rail Clamplock Torque Specifications SR0001SB
5.70 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €