3686 (RP-596) -- Effects of Store Relative Humidity on Refrigerated Display Case Performance PDF

3686 (RP-596) -- Effects of Store Relative Humidity on Refrigerated Display Case Performance PDF

Name:
3686 (RP-596) -- Effects of Store Relative Humidity on Refrigerated Display Case Performance PDF

Published Date:
1993

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Same as paper number CH-93-16-1.

A procedure has been developed that evaluates the effects of relative humidity on the energy performance of refrigerated display cases. The savings in display case energy requirements when operated at a store relative humidity of 35% rather than at 55% ranged from 5% for glass door reach-in cases to 29% for multi-shelf deli cases. The savings depended on the type of display case, with the majority of the cases saving 20% to 30% in operating energy. These numbers compared well with the limited amount of measured or experimental data that was located.

KEYWORDS: relative humidity, energy consumption, display equipment, food industry, shops, supermarkets, refrigeration, energy conservation.


File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 12
Product Code(s) : D-18160
Published : 1993

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138