A50 -- Water Treatment: Deposition, Corrosion, Fouling, and Biological Control (I-P) PDF

A50 -- Water Treatment: Deposition, Corrosion, Fouling, and Biological Control (I-P) PDF

Name:
A50 -- Water Treatment: Deposition, Corrosion, Fouling, and Biological Control (I-P) PDF

Published Date:
2023

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$16.5
Need Help?
This chapter covers the fundamentals of water treatment. It provides guidance on the treatment of water and water-based fluids used in heating, air-conditioning, refrigeration, and process systems, with a focus on the control of corrosion, scale, fouling, and biological growth. Proper treatment improves the performance and energy efficiency of these systems while helping to protect human health and safety. Water treatment also extends the life of equipment in both open- and closed-loop systems. In addition, water treatment can help conserve water resources as well as enable the use of alternative sources of water. All of these benefits help to promote a healthier, more sustainable environment. WATER QUALITY AND ITS SOURCES Water Characteristics Water Sources WATER TREATMENT Control Corrosion and Corrosion Control Biological Growth Control Nonchemical and Physical Water Treatment Methods Water Systems TERMINOLOGY
File Size : 1 file , 1.3 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 26
Product Code(s) : D-A502023IP
Published : 2023
Units of Measure : I-P

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138