DA-07-053 Decoupled Modeling of Chilled-Water Cooling Coils PDF

DA-07-053 Decoupled Modeling of Chilled-Water Cooling Coils PDF

Name:
DA-07-053 Decoupled Modeling of Chilled-Water Cooling Coils PDF

Published Date:
2007

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
da-07-053-decoupled-modeling-of-chilled-water-cooling-coils_1713247

Choose Document Language:
4.80 €
Need Help?

Chilled-water cooling coils are important components in air-handling systems. Generally, the cooling coil removes both moisture and sensible heat from entering air. Because the sensible and latent heat transfer modes are coupled and the saturation humidity ratio vs. temperature curve on the psychrometric chart is nonlinear, it is very difficult to solve cooling coil heat transfer differential equations across the entire coil. However, the sensible and latent heat transfer modes can be decoupled using a constant sensible heat ratio (SHR), and the saturation humidity ratio vs. temperature curve can be treated as linear in a small area corresponding to a finite element of the coil. Then element equations can be easily deduced from decoupled sensible and latent heat transfer differential equations using the effectiveness-NTU method. This paper presents the decoupled cooling coil model using the finite element method with applications to simulation of particular cooling coil cases.



Units: SI


File Size : 1 file , 920 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 10
Product Code(s) : D-DA-07-053
Published : 2007

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €