NY-91-04-2 -- Measurement of Potential Contaminants in Data Processing Environments PDF

NY-91-04-2 -- Measurement of Potential Contaminants in Data Processing Environments PDF

Name:
NY-91-04-2 -- Measurement of Potential Contaminants in Data Processing Environments PDF

Published Date:
1991

Status:
Active

Description:

Publisher:
ASHRAE

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.8
Need Help?

Notes the effect of contaminant such as particles, volatile inorganic compounds (VOC) and a variety of other chemical substances on the reliability of electronic instrumentation. Describes how, by evaluating the environments within data processing centres throughout the telephone industry in the USA, a methodology (environmental audit) has been developed for determining potential equipment contamination problems. This methodology has been applied in numerous data processing facilities across the country. The parameters monitored include airborne particle counts, particulate mass and composition, surface contamination, VOC, temperature and humidity. Describe how an audit is carried out.

 

KEYWORDS: Environment, gases, computer rooms, USA, indoor, air quality, particles, organic compounds, equipment, electronic


File Size : 1 file , 2.1 MB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 13
Product Code(s) : D-18424
Published : 1991

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138