SAE AIR6334 PDF

SAE AIR6334 PDF

Name:
SAE AIR6334 PDF

Published Date:
06/09/2020

Status:
Active

Description:

A Guide to Extending Times Between Overhaul for Rotorcraft Power Train Transmissions Using Monitoring Data

Publisher:
SAE International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$44.1
Need Help?

Time in Service (TIS), or flight hours, logged in maintenance records against an installed rotorcraft transmission is normally used as the ¿¿¿official¿¿¿ time on wing metric for the transmission¿¿¿s component wear out inspection interval requirement and, in some instances, retirement change on life limited parts. This AIR addresses traditional methods of transmission TBO extensions and introduces rotorcraft transmission monitoring usage metrics that could be used to modify TIS inspections by tracking torque to determine both loads on life limited parts and component wear.

This is a document of the SAE HM-1 Committee intended to be used as a technical information source and is not intended as a legal document or standard. This AIR does not provide detailed implementation steps, but does address general implementation, past experience, concerns and potential benefits.


File Size : 1 file , 2.4 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Published : 06/09/2020

History


Related products

SAE AS3130C
Published Date: 12/13/2019
PIN, EXPANSION - CRES, 303, LONG, UNS S30300 (Stabilized: Dec 2019)
$14.7
SAE AS3420C
Published Date: 08/19/2022
BOLT, MACHINE, DOUBLE HEX, EXTENDED WASHER HEAD, CLOSE TOL. SHANK, UNS N07718, 185 KSI MIN .3750-24 UNJF-3A (STRESS RUPTURE RESISTANT)
$14.7
SAE AS6169A
Published Date: 08/12/2019
AS6169: Interface Standard, Airborne EO/IR Systems, Mechanical (Stabilized: Aug 2019)
$46.2
SAE ARP6225B
Published Date: 03/08/2023
Aircraft Tire Inspection - In-Service Removal Criteria
$36

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138