SME MR99-254 PDF

SME MR99-254 PDF

Name:
SME MR99-254 PDF

Published Date:
11/01/1999

Status:
Active

Description:

Micromagnetic In-Process Surface Integrity Analysis Of Ground Workpieces

Publisher:
Society of Manufacturing Engineers

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
A reliable and faultless production represents an elementary demand respecting processes in order to produce high-grade components. Especially in grinding, thermal damage has a great influence on the workpiece quality and thus on the reliability of heavy loaded components. Therefore different micromagnetic sensor systems for a non-destructive detection of residual stresses, surface hardness, depth of hardness, and partly for the avoidance of grinding burn have been developed. Micromagnetic techniques enable fast and non-destructive surface integrity and quality control of ground workpieces. For post-process measurements the magnetic quantities Barkhausen noise and field strength are used. A new micromagnetic analysing system which uses an additional eddy current module will be introduced. Therefore an in-process inspection during machining is possible.
Number of Pages : 10
Published : 11/01/1999

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138