AWWA ACE92187 PDF

AWWA ACE92187 PDF

Name:
AWWA ACE92187 PDF

Published Date:
01/01/1992

Status:
Active

Description:

Utility's Viewpoint in Membrane Filtration Facility Design

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$7.2
Need Help?
From inception to accomplishment, an astonishing quantity of information and knowledge will be utilized by engineers and utility personnel to design a facility for one of the most technically advanced processes in water treatment: membrane filtration. Every aspect of the design, from the piping to the programmable logic process controller will be scrutinized for optimum performance. This paper will add a few features that can be incorporated into the design of a plant to help reach that best effort. Outlined from raw water piping to cleaning systems, suggested improvements for newly constructed plants will also be addressed.
File Size : 1 file
ISBN(s) : 0898676533
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 5
Published : 01/01/1992

History


Related products

AWWA ACE92237
Published Date: 01/01/1992
Relationship Between Pressure and Leakage in a Water Distribution Network
$7.2
AWWA ACE92234
Published Date: 01/01/1992
Tacoma's S.M.A.R.T. Idea (Systematic Maintenance and Renewal Team)
$7.2
AWWA ACE92227
Published Date: 01/01/1992
Water Distribution System Management in Singapore
$7.2
AWWA ACE92218
Published Date: 01/01/1992
The QuikValve Valve Insertion Method
$7.2

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138