NR NR/L2/MTC/EP0233 ISSUE 1 PDF

NR NR/L2/MTC/EP0233 ISSUE 1 PDF

Name:
NR NR/L2/MTC/EP0233 ISSUE 1 PDF

Published Date:
03/05/2022

Status:
[ Revised ]

Description:

Lineside Hot Axle Box Detectors

Publisher:
Network Rail

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$18.6
Need Help?
PDF ONLY

This document applies for lineside HABD installations to:

a) the specification process, including the requirements for site and plant selection;

b) design;

c) installation;

d) testing and commissioning;

e) system operation and response;

f) maintenance, training & competence;

g) protection during track works;

h) product support; and

i) decommissioning.

This document applies to:

a) all parties involved with the specification, design, installation, testing and commissioning, system operation and response, maintenance and decommissioning of HABDs installed on Network Rail infrastructure, including any train or vehicle operating on Network Rail infrastructure that activates the HABD equipment; and

b) all HABDs installed on Network Rail infrastructure.

Purpose 

This document provides a process to: 

a) reduce the risk of hot axle box detectors (HABD) being incorrectly specified, designed, installed, tested, operated, maintained, and decommissioned, 

b) reduce, as far as reasonably practicable, the risk of a catastrophic incident occurring resulting from loss of vehicle axle integrity due to a damaged or failing axle bearing; and 

c) enable compliance with BS EN 15437-1:2009 and GE/RT8014 to be achieved. 


Edition : 1
File Size : 1 file , 37 MB
Number of Pages : 40
Published : 03/05/2022

History


Related products

NR NR/L2/SIG/11129 ISSUE 6
Published Date: 09/03/2011
Life Management of Signalling Relays and Electro-Mechanical Searchlight and Banner Signals
$18.6
NR NR/SMTH/PART 05 ISSUE 19
Published Date: 12/02/2023
Signal Maintenance Testing Handbook (SMTH): Part 05
$24.3
NR RT/ETE/3/3/4
Published Date: 03/17/1998
Arrangement for Terminating 800mm.sq Substation Negative Feeder Cables and Associated Cross and Intertrack Bonds on Lines with Track Circuits
$5.7
NR NR/L3/INV/0113 ISSUE 3
Published Date: 09/05/2009
Statutory Reporting of Accidents, Incidents & Occupational Ill Health
$18.6

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138