AWWA ACE95159 PDF

AWWA ACE95159 PDF

Name:
AWWA ACE95159 PDF

Published Date:
01/01/1995

Status:
Active

Description:

Partnering for the Construction of the Haworth Treatment Plant Maintenance Facility

Publisher:
American Water Works Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
awwa-ace95159_231172

Choose Document Language:
7.20 €
Need Help?
The purpose of this project was to provide facilities for maintenance and patrol force personnel, many of which were relocated from the existing facilities at New Milford plant site. The site was scheduled for abandonment and disposition to Bergen County for park land in December, 1993. The site chosen for the new maintenance facility was a location within the Haworth Water Treatment Facility. Partnering was used in the planning, design, and construction of the facility and involved assembling a team of personnel from the Company, an architect, an engineer, and a construction manager. The mission of this group was to deliver a high quality project from the design stage through the final construction. The partnering team was assembled in March, 1992, the final conceptual plan was adopted in the fall of 1992, and construction was completed by early December, 1993. Final work included renovation of the existing building, construction of two additions to this building including a concrete loading dock, and construction of a new parking area, roadway and walkway. Total cost of this project, including design, construction, and legal costs, was $1.68 million dollars.
File Size : 1 file
ISBN(s) : 0898678358
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 13
Published : 01/01/1995

History


Related products

AWWA ACE95161
Published Date: 01/01/1995
"We Commit..." A Presentation of the Partnering Approach to Project Management of the Tri-County Water Supply Project
7.20 €
AWWA ACE95148
Published Date: 01/01/1995
Effective Metering
7.20 €
AWWA ACE95135
Published Date: 01/01/1995
Stand-By Charges & Fire Sprinkler Systems
7.20 €
AWWA ACE95130
Published Date: 01/01/1995
Considerations for the Planning and Design of Improvements to an Existing Water Supply Facility
7.20 €

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
138.00 €
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
138.00 €
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
138.00 €
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
138.00 €
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
138.00 €