NG UKBP/TP 193 PDF

NG UKBP/TP 193 PDF

Name:
NG UKBP/TP 193 PDF

Published Date:
08/01/2016

Status:
[ Active ]

Description:

UK Business Procedure/Transmission Procedures - Programme Management - Planning & Project Controls

Publisher:
National Grid

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$147
Need Help?

PURPOSE AND SCOPE

Transparent and accurate reporting of investment decisions, project performance and financial data is a Regulatory Requirement on National Grid. It is therefore subject to OFGEM audit, and can attract regulatory penalties if the required standards cannot be demonstrated.

This document defines the minimum standard for project planning and project controls requirements. It is applicable to all projects being delivered for Capital Delivery on behalf of National Grid.

It is recognised that for investments that fall in to the category of single asset replacement /refurbishment/recondition ( as defined in UKBP/TP236) then the full application of this TP may not provide the most cost efficient means of delivering that investment and hence TP minimum requirements as defined in UKBP/TP236 can be applied.

These minimum requirements are defined for each type of single asset replacement/ refurbishment/ recondition investment and are presented as separate appendices in UKBP/TP236. E.g. Appendix B - CB Replacement (with CT’s) & (without CT’s)

Amendments to this procedure shall be reflected in UKBP/TP236 Appendices (if required) and may result in re-issue of UKBP/TP236 within the same period.

Audience: National Grid staff within Capital Delivery who are developing and delivering projects, e.g. OHLCS, MID, Development, LPT and any Contractors responsible for the planning and delivery of those works.

This procedure and the accompanying document_ATTACHMENT TO UKBP/TP 193 PROJECT CONTROLS REFERENCE GUIDE. (split into two parts for clarity, 193.1 for National Grid use and 193.2 for Contractors) apply to all capital works. Where derogation to this procedure is agreed for the work to be completed these will be highlighted in the Works Information.


Edition : 5
File Size : 1 file , 330 KB
Number of Pages : 8
Published : 08/01/2016

History

NG UKBP/TP 193
Published Date: 08/01/2016
UK Business Procedure/Transmission Procedures - Programme Management - Planning & Project Controls
$147
NG UKBP/TP 193
Published Date: 03/01/2016
UK Business Procedure/Transmission Procedures - Programme Management - Planning & Project Controls
NG UKBP/TP 193
Published Date: 03/01/2014
UK Business Procedure/Transmission Procedures - Programme Management - Planning & Project Controls

Related products

NG UKBP/TP 183
Published Date: 05/01/2018
UK Business Procedure/Transmission Procedure - Type Registered Equipment Procedural Requirements
$144.9
NG TGN(E) 203
Published Date: 12/01/2004
Technical Guidance Notes - Back-Up Protection Grading Across National Grid Transco/Distribution Network Operator Interfaces
$55.2
NG TS 3.04.06
Published Date: 01/01/2002
National Grid Technical Specifications - Conductor Fittings for Overhead Lines
$55.2
NG UKBP/TP 221
Published Date: 02/01/2019
UK Business Procedure/Transmission Procedures - Technical Data Processing and Assurance
$55.2

Best-Selling Products